Case Studies

At S and B EPS Ltd we continously strive to exceed expectations in everything we do. From product quality and innovation to customer service, we aim to deliver nothing but the best.

Co-op
Manchester Co-op

The Challenge

The Eps was used as void fillers on the floor sections of this state of the art building. As the building will concentrate on being low carbon and environmentally efficient, all Eps will help towards this commitment.

The Client Brief

S and B Eps supplied Bespoke CNC profiled cut EPS - to help in the build of the new £100 million Manchester Co-op head office.

Working in conjuction with Bam construction, S and B supplied many 80 cu-m articulated truck loads of specialised material over a 4 month period.

Being involved in such a high profile project was a tribute to our company.


Darren Smith

Managing Director - S and B Eps Ltd

QUALITY STANDARDS


Other secondary case studies

Tyne Tunnel


The ability of S and B eps to supply the required...

Read more

Barratt


S and B initially supplied Eps 100 blocks to fill...

Read more

Sto Ltd


The System used was a Sto-Turbofix and StoTherm Cl...

Read more

Milbank


The interlocking panels where placed onto the pre...

Read more

Balfour Beatty


A certificate of conformity to BS EN 14933: 2007...

Read more

Balfour Beatty


S and B EPS fill 70 material obtains an A+ rating...

Read more

Coronation Street


To supply over 650 cu-m of EPS 150 within a short time scale specified...

Read more

BASF and NEOPOR


S and B Eps are only one of a select few throughout Europe...

Read more