The specification needed was S and B EPS 150 flooring grade to BS13163 EN standard, compression values of 150 Kpa were manufactured to obtain these values.
Specialised Vehicles were used for the ease of delivery with Eps supplied.
The series that has been going on for over 52 years is now being built on the foundations using Eps that also has the same life length and more , taken the program into 2050.
To supply over 650 cu-m of EPS 150 within a short time scale specified, working in close contact with the contractors ready for steel reinforcement and concrete pouring.
High cross break and compressions specifications were needed for the new Coronation Street Studios.
Supplying the insulation for the New Coronation Street Studios ground work, was a pleasure to work on and be involved with such an iconic soap opera.