S and B EPS Fill 70 grade material was selected as the preferred option during the construction of the Olympic Aquatic centre.
S and B EPS liaised with Balfour Beatty to coordinate deliveries of up to 800 cu-m of material per day delivered in accordance with designated booking slots.
The Lightweight, energy efficient EPS blocks with a safe working load capacity of 7 tonnes per square metre were laid around the Aquatic centre allowing the required depth of fill to be obtained without the need for multiple pours and extended drying times.
S and B EPS fill 70 material obtains an A+ rating in the BRE green guide and has an ODP of 0 and GWP potential of less than 5.
S and B are proud to be associated with Balfour Beatty and the Olympic Site supplying CE marked civil engineering products to BSEN14933
Being involved in such a prestigious project and to be a chosen EPS supplier was a great honour for S and B EPS limited